X

HANOI HAVE "BUSY CAR" OUT OF RIVER?

14/07/2018 - 02/08/2018
5226
1

Ha Noi Transport received the proposal to build a passenger cable car across the Red River of a foreign corporation.

The proposed unit is the Poma Group, a cable car company in the Republic of France. The cable car is offered by the company for public transport - VTCC (bus) Long Bien bus transfer station (Tran Nhat Duat street, Hoan Kiem district), the last point is Gia Lam bus station (Long Bien district).

Accordingly, the investor will build a hang glider operating on the clamp platform, moving the cabin in the air through the cable. The cables are extended through supports 50 to 100 meters high. With a capacity of 25 to 30 passengers per cabin, each hour of cable carries about 1,000 people with a cable below and 6,000 people with cable over the top.

The upper road has a length of over 5 km, including about 1.2 km of cable car crossing the Red River, about 4 km left on the ground and over the buildings, high-rise buildings on the ground.

Assessing the advantages of the cable car, the representative said that by operating in the air and traveling on the private lane (cable), the cable runs very stable, on time, the probability is calculated. seconds. "When the cable car came into operation, passengers moved from the Long Bien bus station to Gia Lam station and vice versa in just a few minutes. This route compared to traveling on public or private vehicles as it is, at peak hours it usually takes from 30 minutes to 1 hour, "the investor presented.

Installation in 12 to 24 months

Referring to the plan and time of implementation, representatives of Poma Corporation said that because of basically no ground clearance, no obstacles on the ground, so with a length of 4 - 5km, investors give Know, after the authorities agree, investors will deploy the project within 12 to 24 months.

At the meeting, the investor said that only the plan to apply the policy should have no financial options, specific impact, this investor will have to explore and develop a concrete plan if The proposal is requested in detail.

Map

Direction to